Headlines

Cabinet Clears ₹19,934-Crore Package: ₹11,000-Crore Push for Construction Equipment, New Airport in Assam, Second Terminal at Kamarajar Port

South Block in New Delhi, where the Union Cabinet meets File photo: South Block, New Delhi. Photo: Wikimedia Commons / A. Savin (Free Art License).

New Delhi Bureau
The Union Cabinet approves Rs 19934 crore package spanning construction equipment manufacturing, a second container terminal at Kamarajar Port, a greenfield airport in Assam and two postal schemes.

The Union Cabinet approves Rs 19934 crore package at its meeting on Wednesday, chaired by Prime Minister Narendra Modi, clearing five proposals worth a combined ₹19,934 crore. Union minister Ashwini Vaishnaw announced the decisions at a press briefing in New Delhi, setting out the details of each proposal and the money attached to it. The five add up as follows: ₹11,000 crore for construction equipment manufacturing, ₹4,288.26 crore for the Kamarajar Port terminal, ₹2,014 crore for the Assam airport, and ₹1,141 crore and ₹1,491 crore for the two postal schemes.

Union Cabinet approves Rs 19934 crore package: ₹11,000 crore for construction equipment

The largest item on the list is the ₹11,000-crore Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem, run by the Ministry of Heavy Industries over eight years from 2026-27 to 2033-34. It will work in three stages: a two-year gestation period in 2026-27 and 2027-28, five years of incentive payments from 2028-29 to 2032-33, and a final year in 2033-34 for settling claims.

A hydraulic excavator at a construction site
File photo: A hydraulic excavator at a construction site. Excavators are among the seven equipment categories covered by the new scheme. Photo: Wikimedia Commons / Oto Zapletal (CC BY-SA 4.0).

The scheme has two parts: a sales-linked incentive for manufacturers, graded from 13 per cent to 8 per cent of incremental sales over five years, and grant support of up to ₹375 crore for a dedicated testing facility for construction equipment. It covers seven categories of machinery that India largely imports today — tunnel boring machines, off-highway trucks, excavators, cranes, loaders, piling rigs and drilling machines. India is the world’s third-largest construction equipment market after China and the United States, with the market at about ₹97,500 crore in 2024-25 and projected to reach about ₹2,28,100 crore by 2029-30. The aim is to cut import dependence, build domestic capacity and create a testing and certification base at home. Details of the scheme are set out in the government’s release.

The equipment scheme follows the same playbook as the government’s semiconductor programme, which opened its Semicon 2.0 portal for applications earlier this month.

Second container terminal at Kamarajar Port

The Cabinet Committee on Economic Affairs cleared a second container terminal at Kamarajar Port in Tamil Nadu, at a cost of ₹4,288.26 crore including GST. The terminal will be built in public-private partnership mode on a design, build, finance, operate and transfer (DBFOT) basis, under a 40-year concession. It will have a 900-metre quay and an 18-metre design draft, and will be able to handle 2 million TEUs a year once both phases are complete.

Phase I, costing ₹2,429.32 crore, will create capacity of 1.1 million TEUs, and Phase II, at ₹1,858.94 crore, will add the remaining 0.9 million TEUs. The new terminal is expected to ease congestion at the port and strengthen Tamil Nadu’s position in container trade on the east coast.

Greenfield airport at Doloo, near Silchar

The Cabinet Committee on Economic Affairs also approved a greenfield airport at Doloo in Assam’s Cachar district, near Silchar, at a cost of ₹2,014 crore. The Airports Authority of India will develop the airport, which will replace the civil enclave at Silchar Airport — a facility on defence land whose operations are constrained.

The new airport will have a terminal building of 12,351 square metres, capacity for 800 passengers at peak hour, a 2,705-metre by 45-metre Code-4C runway suitable for A-320 aircraft, and an apron for six A-320 aircraft plus an isolation bay. The airport matters for South Assam and the Barak Valley, a region of tea gardens, agro-industry and eco and cultural tourism, and for neighbouring states that depend on Silchar for air connectivity.

Postal Operations and Postal Estates schemes continue

The Cabinet also approved the continuation of two postal schemes for 2026-27 to 2030-31, the period of the 16th Finance Commission. The Postal Operations Scheme will continue with ₹1,141 crore, and the Postal Estates Management Scheme with ₹1,491 crore — together ₹2,632 crore for the Department of Posts over five years. The two schemes fund the running of postal operations and the upkeep of postal estates across the country.

Why it matters and what happens next

Taken together, the five decisions touch manufacturing, trade, connectivity and public services. The equipment scheme is the most consequential in the long run: if it works, India will make more of the machines that build its roads, metros, ports and mines, instead of buying them abroad, and a domestic testing facility will give manufacturers a way to certify their products at home. The Kamarajar terminal adds container capacity on the east coast, where trade has been growing, while the Doloo airport gives South Assam its first full airport and a direct link for a region that has long relied on a constrained enclave. The postal schemes keep the country’s largest delivery network running through the next Finance Commission period.

The Union Cabinet approves Rs 19934 crore package at a moment when the government is pushing to localise supply chains across sectors. The Cabinet has used the same approach in recent months, clearing a ₹10,000-crore SME Growth Fund in October to give small firms equity rather than loans, and the decisions come a week after the Prime Minister chaired a meeting of the Union Council of Ministers to review the government’s record.

What happens next depends on the ministries concerned. The heavy industries ministry will run the equipment scheme through its three stages, the port terminal will be awarded under the DBFOT model, and the Airports Authority of India will develop the Doloo airport. No completion dates have been announced for the projects, and the government has not said when tenders will open.

The Union Cabinet approves Rs 19934 crore package, and its progress will now be watched for how quickly the money turns into factories, berths and runways.

Sources: Press Information Bureau, The Times of India, ABP Live and NDTV Profit.

Disclaimer: This story has been prepared on the basis of available sources and verification. If any fact is found to be incorrect, a correction will be published.

Leave a Reply

Your email address will not be published. Required fields are marked *

दैनिक संपूर्ण प्रदेश — आपका अपना अख़बार